by Jamie | Aug 31, 2018 | Industrial, Office
Back in May 2017, we had the privilege of installing 2 separate floors at the Royal Mail depot in South London. The first floor we tackled was the sorting area. This is a fast paced environment with a lot of foot traffic where safety and grip are paramount. That’s why...